Estimate desk
How costing works — without surprise bundles
Quotations mirror how signs are actually fabricated: materials, manpower, hoist minutes, diffuser lifetimes, and authority touchpoints separated so you always know what shifts the needle.
- 01You drop context. Photos of the fascia or hoarding, rough sizes, tenancy rules, landlord PDFs when you have them, brand kit.
- 02We respond fast. Target ≤3 hours on weekdays for first-pass BoQ—we flag missing info instead of burying placeholders.
- 03Fabrication-aligned lines. Steel / ACM substrates, diffuser grade, pixel pitch, hoist or swing licences, façade power drops, commissioning—each labeled.
Included by default
- Technical takeoff + BOM snapshot
- Coordination sketches for malls / highways when applicable
- Supervised install orchestration slots
Called out separately
- Crane lifts, mast climbers, nightly premiums
- Third-party scaffolding not bundled with façade teams
- Authority inspection rescheduling fees—if timelines slip externally



