Service
Rooftop signage Dubai
Skyline-visible builds with disciplined structural notes, uplift assumptions, crane or MEWP choreography, and documentation your landlord expects.

What we deliver
- ·Structural pack reflects wind region, setback, podium vs tower rules
- ·Night installation windows negotiated with mall / facilities teams
- ·Power routing, glanding IP ratings, thermals for concealed drivers
Need hoarding, rooftops, or a full façade package alongside this scope? Mention it when you enquire — we route installs with approvals context where required.
FAQ
Common questions
Practical questions about estimating, timelines, finishes, and installation.
Do rooftop signs need approvals?
Most high sites require municipality and landlord approvals. We annotate drawings for submission and revise for comments without losing fabrication intent.
What drives cost most?
Height access, crane or swing stage days, galvanised substrates, redundancy for LED feeders, lightning bonding context — everything is spelled out line-by-line in the estimate.
Can you survey an existing rooftop tray?
Yes — lidar or manual pick-ups feed into anchor layouts so we engineer against real steel.
Service access later?
We design walkways or removable fascias where practical so LED swaps do not halt trading floors.
Workshop-led production in Dubai
In-house fabrication, reliable materials, and install-ready coordination from brief to completion.
Call +971 52 363 5858


