
Small (2–3 sqm)
Roll-up stands, banner walls, reception desk, branded counter — quick to deploy, easy to ship between events.
- Setup time
- 2–4 hours
- Components
- 5–8 modules
- Reuse
- 5+ events
- Storage
- 1–2 crates
Manufacturing visibility
Service
Layered trussing or tension-fabric rigs for expo halls across DWTC, ADNEC — storage-conscious knock-down crates.

Need hoarding, rooftops, or a full façade package alongside this scope? Mention it when you enquire — we route installs with approvals context where required.
2,000+ projects
Retail, F&B, corporate, expo across the UAE and beyond since 2018.
3-day production
Standard signs, lightboxes, and 3D letters — workshop-led, predictable lead times.
3-year warranty
Materials and workmanship — issues resolved at our expense within warranty.
Free quote in 3 hours
Itemised estimate plus free design and 3D visualisation before commitment.
Types & specifications

Roll-up stands, banner walls, reception desk, branded counter — quick to deploy, easy to ship between events.
Most requestedPress wall, TV stand, demo counter, info kiosk, storage room — balanced footprint for B2B sales conversations and product demos.

Custom builds — meeting room, demo lab, hospitality zone, programmable LED accents, suspended trussing. Designed against your booking footprint.
How we work
Step-by-step process — predictable timelines, predictable payments.
1–2 days · free
Concept, dimensions, finish palette, 3D render — itemised before any commitment.
1–2 days
DWTC / ADNEC organiser submission, rigging plan, ballast calcs, AV pathways agreed.
2–7 days · 50% prepay
Workshop fabrication in our Ras Al Khor facility — quality control before shipment.
Build-up slots · 24/7 ops
On-site supervision, cable management, daily snag-list, dismantle to crate inventory after the show.
Selected projects
A snapshot of recent work from our portfolio.








Pricing
from
450
AED / sqm
* Indicative starting rate — final price comes in the free 3-hour itemised quote.
50% on manufacturing start, 50% on installation completion.
0% interest installment up to 12 months — on request.
UAE permits & compliance
Exhibition stands at DWTC, ADNEC, and major UAE venues require organiser sign-off on rigging plans and ballast calcs before build-up. We submit the structural pack, manage approvals, and coordinate hall sparkies for AV and mains separation.
Trusted by
Selected brands and projects we have delivered for over the years.










Related services
Adjacent products often commissioned alongside this one.
Neon signs Dubai
High-impact luminous façades & interiors with efficient LED neo-aesthetic assemblies.
From 64 AED / sqm
Lightbox manufacturing Dubai
Even illumination, diffuser grades for UAE UV, repeatable retail rollout builds.
From 131 AED / sqm
Dimensional letters & logos Dubai
Depth, trims, halo or face-lit studies with substrate-aware fixing patterns.
From 1.5 AED / cm
Rooftop signage Dubai
High-level visibility installs engineered for Dubai wind, access plans, and approvals context.
Projects from ~1 555 AED (scope-dependent)
Signboards Dubai
Monolith builds for storefronts — quick reads at speed and compliant mounting packages.
From 64 AED / sqm
Panel-mounted brackets Dubai
Bracketed faces for ACM / composite panels — alignments tuned for fascia rhythm and servicing.
From 130 AED / unit (typical fascia)
FAQ
Practical questions about estimating, timelines, finishes, and installation.
Yes — mothball crates with humidity silica; condition reports before each redeploy. Storage is included in our hybrid lease packages or charged separately for owned stands.
Hybrid packages amortise truss and reusable modules over three seasons if your event calendar is predictable. One-off shows usually rent; multi-event programmes often save money buying.
Cable pathways are separated from mains per hall sparky rules. We coordinate with hall AV teams on signal handoffs and provide redundancy on critical screens for keynote moments.
Express lane adds a third production shift. Critical path is communicated daily and fabrication is parallelised against approvals so the build-up window doesn't slip.
We coordinate with hall security, lift access, and time slots from our Ras Al Khor facility. For ADNEC, transit times and visa coordination for crew are pre-booked against the build-up calendar.
In-house fabrication, reliable materials, and install-ready coordination from brief to completion.
Call +971 52 363 5858